You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Sports arena Lora

Datos de Proyecto

Ubicación: Split, Croacia

Multi-purpose hall with octagonal layout, 120 m x 80 m, and 12,500 seats

Finished: 2009 for the handball world championship in Croatia

Requerimientos

  • erecting scaffolding for 8 steel lattice girders
  • 180 tons of load per pair of trusses

Cliente

Dinarik d.o.o., Donji Prolozac

Beneficios para el cliente

  • cost-effective roof assembly
  • safe and fast erecting work
  • economic solution with system parts
 Oliver Pezer, Work preparation and logistics, Statement Sportarena Lora
Oliver Pezer
Work preparation and logistics

We chose PERI because of the professional formwork planning and support. All technical requirements were met in a cost-effective way with the PERI systems.

Solución PERI

  • PERI UP as shoring and erecting platform
  • brace frames used in suspended position as 7 m protruding support structure

Sistema PERI en uso